|
Serena by the door
September '06
|
|
Before...
August '04 - Deep in the woods of rural Connecticut...
|
|
Back Deck
May '06 - Serena put the deck together, and we had just finished the first side of the new cedar shingles.
|
|
Staining cedar shingles
Summer '06 - We set up a dip tent to dip what we estimated to be about 1500 individual cedar shingles.
|
|
Maz among the shingles
Summer '06
|
|
Dave breaking up cracked concrete
August '06
|
|
Residing
October '06 - The salvaged stone wall in the foreground was moved in by hand.
|
|
Spackling
March '07 - Tackling the interior...
|
|
Serena putting some trim on the ceiling in the loft
January '07
|